SS&A was a technical consultant for a feasibility study for various gas turbine and plant upgrades and technical concept designs for modifications of the plant to meet changing operational requirements, including steam extraction and shifting power demand. A study was also prepared to extend the plant’s operating regime for low load capability, with very low load operation and even zero load operation of the gas turbines.